​
Back to Projects

Nexus West Energy Campus

Early Development
|
CAROLINE AREA, ALBERTA
Abundant energy. Exceptional scale. A platform for long-term growth.
932 MW
Generation Potential
600 MW
Data Centre Load Potential (initial phases)
Multiple Gas
Supply Options • Producers + NGTL
Crown Land
Scalable Site Opportunity
THE OPPORTUNITY

A large-scale energy campus for Alberta’s growing economy.

Nexus West is a 932 MW potential natural gas-fired generation project in the Caroline area, Alberta, approximately 60 km west of Innisfail and southwest of Red Deer. The project is designed to provide reliable, scalable power for large industrial and data centre development, with up to 600 MW of data centre load over time, with flexible development phases.

Located on Crown land in a proven energy region, Nexus West benefits from multiple gas supply options, proximity to existing infrastructure and a strong regional industrial base. The project is in early development, with a focus on securing key permits, refining design and advancing commercial discussions.

Key Advantages

Large scale potential
Large scale potential
Significant load opportunity
Up to 600 MW data centre load potential over time.
Multiple gas supply options
Access to nearby producers and future NGTL connection opportunities.
Crown land
Large site with flexibility for future phases and expansion.
Strategic location
In the Caroline area, southwest of Red Deer, with access to infrastructure and workforce.
Supportive region
Located in a well-established energy and industrial region.
Engaged stakeholder
Ongoing engagement with local communities, Indigenous groups and government.
Flexible development pathway
Ability to phase development to meet market demand and customer requirements.

Project at a Glance

GENERATION
932 MW potential natural gas-fired generation using proven technology.

GAS SUPPLY
Multiple gas supply options including nearby producers and future NGTL access.

LAND
Crown land with significant expansion potential for a multi-phase campus.

LOAD
Up to 600 MW data centre load potential over time, with flexible development pathway.

‍Let's Build Whats Next

Partner with Nexilon to develop the next generation of power and infrastructure in Alberta.
Let's Talk
Powering
Opportunity
For Generations