ResiliON Energy Campus

Early Development
|
LAC STE. ANNE COUNTY, ALBERTA
Strategic location. Scalable infrastructure. A resilient foundation for what’s next.
932 MW
Generation Potential
800 MW
Data Centre Load Potential (over time)
Multiple Gas
Supply Options • Producers + NGTL
Freehold Land
Scalable Site Opportunity
THE OPPORTUNITY

A resilient energy campus in Alberta’s power heartland.

ResiliON is a 932 MW potential natural gas-fired generation project in Lac Ste. Anne County, Alberta, located west of Edmonton and north of the Genesee generation area. The project offers up to 800 MW of data centre load potential over time, supported by multiple natural gas supply options, including nearby producers and future NGTL access.

With its strategic location, proximity to an established power region, and access to a skilled workforce and critical infrastructure, ResiliON provides a compelling opportunity to develop a large-scale, integrated energy and data centre campus. The project is in early development, with a focus on securing key permits, advancing design and engaging with communities, Indigenous groups and other stakeholders.

Key Advantages

Strategic location
Strategic location
Large generation potential
932 MW potential on-site generation capacity.
Significant load opportunity
Up to 800 MW data centre load potential over time.
Multiple gas supply options
Access to nearby producers and future NGTL connection opportunities.
Scalable freehold site
Large site with flexibility for future phases and expansion.
Established energy region
Close to the Genesee generation area and existing transmission infrastructure.
Supportive stakeholders
Constructive engagement with local communities, Indigenous groups and government.
Growing demand
Well positioned to support increasing data centre and industrial power demand in Alberta and Western Canada.

Project at a Glance

GENERATION
932 MW potential natural gas-fired generation using proven technology.

GAS SUPPLY
Multiple gas supply options including nearby producers and future NGTL access.

LAND
Freehold land with significant expansion potential for a multi-phase campus.

LOAD
Up to 800 MW data centre load potential over time, with flexible development pathway.