Rimbey Energy Campus
Advanced Development
|
RIMBEY, ALBERTA (PONOKA COUNTY)
Reliable energy. Scalable infrastructure. A platform for long-term growth.
932 MW
Generation Potential
600 MW
DTS Load (over time)
Multiple Gas
Supply Options • Producer + NGTL
Freehold Land
Scalable Site Opportunity
THE OPPORTUNITY
A strategically positioned energy campus in Central Alberta.
The Rimbey Energy Campus is a 932 MW potential natural gas-fired generation project in Rimbey, Alberta (Ponoka County), with a 600 MW data centre load pathway over time. The project benefits from multiple gas supply options, including a nearby producer connection and future NGTL access, and is located in a well-established energy region.
With freehold land, proximity to existing infrastructure and a supportive regional environment, Rimbey offers a compelling opportunity to develop a large-scale, integrated energy and data centre campus. The project is in advanced development, with key permits progressing, detailed design activities underway and continued engagement with stakeholders and Indigenous groups.
Key Advantages
Multiple gas supply options
Multiple gas supply options
Large generation potential
932 MW potential on-site generation capacity.
Scalable load opportunity
600 MW data centre load (over time).
Freehold land
Large site with flexibility for future phases and expansion.
Strategic central location
Rimbey, AB (Ponoka County) – close to existing infrastructure and workforce.
Established energy region
Located in a proven energy area with existing infrastructure and industrial activity.
Supportive stakeholders
Constructive engagement with local communities, Indigenous groups and government.
Flexible development pathway
Ability to phase development to meet market demand and customer requirements.
Project at a Glance
GENERATION
932 MW potential natural gas-fired generation using proven technology.
GAS SUPPLY
Multiple gas supply options including a nearby producer connection and future NGTL access.
LAND
Freehold land with significant expansion potential for a multi-phase campus.
LOAD
600 MW data centre load (over time) with a flexible development pathway.

Let's Build Whats Next
Partner with Nexilon to develop the next generation of power and infrastructure in Alberta.
Powering
Opportunity
For Generations
Opportunity
For Generations